The All KPIs grid in KPI Hub shows every KPI you're responsible for, one facility at a time, with a cell for each month.
Before you start, you need:
• Access to KPI Hub
• At least one facility and KPI assigned to you by your admin
How it works
The grid is your list. There's no separate "assigned to me" page. The KPIs you see are the ones you've been given.
One facility at a time. Pick a facility, and the grid shows its KPIs by month (or quarter or year, depending on the KPI).
Owners and CCOs see everything. Everyone else sees only the facilities and KPIs they've been given.
Step 1: Open the grid for your facility
Each time you report.
1. Open All KPIs
In the sidebar, click Projects, open KPI Hub and click the All KPIs tab.
2. Pick the facility
Open the facility picker (1). It shows how many KPIs each facility has for you. Choose the facility (2).
Step 2: Narrow the grid
When you're looking for something specific.
Use the toolbar above the grid: the reporting year (1), Search KPI in this facility (2) and the status filter (3).
The status filter (1) shows only the cells you need:
Missing: nothing entered yet.
Overdue: nothing entered and the due date has passed.
Logged: a value has been entered.
Rejected: a reviewer sent the entry back.
Approved: a reviewer accepted the entry.
Each row is a KPI and each column a period. Click a cell to enter or review data. See "How to enter data for a KPI".
If something goes wrong
You see | What to do |
"You don't have any KPIs assigned to you yet" or "You don't have any facilities assigned to you yet" | Ask your admin to give you facility and KPI access in Settings › Members. |
A cell shows n/a | The facility isn't active in that period, so there's nothing to report. |
The grid says "Read-only" | Your role can view but not enter data. Ask your admin if you should be a Contributor. |
Checklist
☐ All KPIs open in KPI Hub
☐ Facility chosen
☐ Reporting year checked
☐ Missing or Overdue filter used to see what's due
Still stuck? Chat with us using the chat icon in Noa.



