Correct the value, note or evidence on an entry you've already logged. Noa keeps the original in the audit trail and sends the corrected entry back for review.
Before you start, you need:
• An Owner, Admin, CCO or Contributor role
• An entry that isn't approved yet. Approved entries need re-opening first (see below).
How it works
Nothing is lost. Editing replaces the entry with a new version. The old value stays in the audit trail.
Back to review. The corrected entry goes to your reviewer again.
The unit is fixed. You can change the number, note and evidence, not the unit.
Step 1: Open the entry
Whenever a logged value needs correcting.
In KPI Hub, open All KPIs, choose the facility and click the filled cell. Cell entries lists every entry for that cell. On the entry's row, click the pencil (Edit entry).
Step 2: Make the correction
In the Edit entry form.
Change the QUANTITY (1), add a NOTE on why it changed (2), and attach evidence if you have it. Then click Update entry (3).
Always say why. A short note such as "Corrected after meter recheck" saves your reviewer a question.
Step 3: Check it worked
Right after saving.
The cell shows the new value. In KPI Hub › Data Ledger, open the entry: the audit trail lists both values and shows the old one as Replaced by newer entry (1).
If something goes wrong
You see | What to do |
No pencil, and the entry shows locked | It's approved. Ask an Owner, Admin or CCO to open it in Data Ledger and click Re-open, then edit it. |
An auditor has approved the entry | Audited entries can't be re-opened or edited. Chat with us if a correction is needed. |
The entry shouldn't exist at all | Click the bin icon (Withdraw entry) on its row, if it isn't approved. |
Checklist
☐ Entry opened from its cell
☐ Quantity, note or evidence corrected
☐ Reason added in NOTE
☐ Update entry clicked, and the new value showing
Still stuck? Chat with us using the chat icon in Noa.


