Answers can change until the report is filed, for example when a figure is restated. Updating one takes three steps, and every change is kept.
Before you start, you need:
• An Owner, Admin or CCO role, or to be the data point's assignee
How it works
Final answers are locked. Move them back to draft before editing.
Every save is recorded in VERSION HISTORY, with who and when.
Saving keeps the status. Send it for review again when you're done.
Step 1: Open the answer
From Report Builder.
Search for the question and click its row. If the STATUS card shows Final, click Back to draft first.
Step 2: Change it and save
Value, narrative or table.
Edit the value (highlighted) and the NARRATIVE (highlighted), then click Save.
Step 3: Add evidence and resend
When the change is complete.
Under SOURCES, click Upload (highlighted) to add supporting files. VERSION HISTORY shows the change you just made. Then click Send for review in the STATUS card.
If something goes wrong
You see | What to do |
You can't edit a final answer | Click Back to draft in the STATUS card. |
A generated report shows the old answer | Generate the report again on Disclosures. |
Checklist
☐ Answer moved back to draft, if final
☐ Change made and Save clicked
☐ Evidence uploaded
☐ Send for review clicked
Still stuck? Chat with us using the chat icon in Noa.


