Check your monitored values against the limits in your environmental permits. For example, a consent condition that wastewater COD must stay at or below 250 mg/L. There are two steps: set the monitors, then watch their status.
Before you start, you need:
• The Consent to Operate project added to your workspace
• Owner, Admin or CCO role to set up monitors
• The KPI already collected in KPI Hub, and your permit conditions
How it works
It reads your KPI Hub data. Nothing is entered twice, and nothing is changed.
Each monitor is one limit on one KPI, for one facility or the whole organisation.
Status updates with each new reading: Compliant, In breach, or No data.
Step 1: Add monitors
Owner, Admin or CCO.
1. Open Setup
Open Projects, then Consent to Operate, then Setup. Every active KPI is listed with its last reading. Click + Add monitor (highlighted) on the KPI.
2. Set the limit
Pick the Facility, the Compliance rule (such as Must be ≤ threshold), the Threshold value, the unit and the Window (highlighted). Under Regulatory basis, enter the permit condition, such as "Permit condition 4.2(b)" (highlighted). Click Add monitor.
Step 2: Watch the status
Anyone with access.
Monitors
Open Monitors. The banner shows your compliance %, how many monitors are In breach and how many are Compliant. Each monitor shows its latest reading against the limit.
If something goes wrong
You see | What to do |
A monitor shows No data | The KPI has no reading for that facility yet. Enter it in KPI Hub. |
The Breach Log is empty | Breach history isn't recorded yet. Check the Monitors tab for current status. |
A KPI isn't listed in Setup | Only active KPI Hub KPIs appear. Add it in Onboarding. |
You can't add a monitor | Only Owners, Admins and CCOs can. |
Checklist
☐ Monitors added for each permit limit
☐ Regulatory basis recorded
☐ Monitors tab checked
Still stuck? Chat with us using the chat icon in Noa. Tell us the KPI and the permit condition.


