Follow how a value changed over time and who changed it, for example a solar figure corrected from 2,380 to 2,830 kWh after a rejection. It takes two steps.
Before you start, you need:
• Access to KPI Hub
How it works
Nothing is overwritten. A correction creates a new version; the old one stays in the trail.
Any version shows the whole chain. Open the current or an old version and you see every step.
Files and comments aren't tracked here. Check EVIDENCE and DISCUSSION in the same panel.
Step 1: Open the entry
From the Data Ledger.
In KPI Hub › Data Ledger, search or filter for the entry and click it. Scroll to AUDIT TRAIL.
Step 2: Follow the change
Oldest to newest.
Look for Entered with the old value, any Rejected line with its reason, then Entered again with the new value and Replaced by newer entry. Each line says who and when.
An edit made without a rejection shows the same way: the old Entered line, then Replaced by newer entry (1).
If something goes wrong
You see | What to do |
You need to know when a file was swapped | File changes aren't tracked. Check each file's upload date under EVIDENCE. |
You need a change log for a whole period | Chat with us. Trails are shown one entry at a time. |
Checklist
☐ Entry opened in the Data Ledger
☐ Old and new values found in the trail
☐ Who changed it, when and why noted
Still stuck? Chat with us using the chat icon in Noa.


