Link a KPI to the sites that report it. You do this with a KPI tag that both the KPI and the facilities carry.
Before you start, you need:
• Owner, Admin or CCO (compliance officer) role in your Noa workspace
• The KPI and facilities already in Onboarding
• A KPI tag, for example "Water". See "How to create tags".
How it works
No facility picker on a KPI. The link is made by a shared KPI tag.
Tag both sides. Put the tag on the KPI, and on each facility under KPIs tracked here (by KPI tag).
One tag, many links. Every facility with the tag tracks every KPI with it.
Step 1: Tag the KPI
Once per KPI.
In the left sidebar, click Projects, then Onboarding. Click KPIs, then Confirmed. Click the pencil on the KPI's row. In the Tags field (highlighted), pick the KPI tag and click Save changes.
Step 2: Add the tag to each facility
Once per facility that reports the KPI.
1. Open the facility
Click Facilities, then Confirmed. Click the pencil on the facility's row.
2. Add the KPI tag
In the Edit facility drawer, under KPIs tracked here (by KPI tag) (highlighted), click + and tick the same tag. It saves straight away.
Step 3: Check the result
After tagging.
On KPIs, click the KPI's row to open its record, then Where tracked. Each facility is listed with the tag that links it, for example Via Water.
If something goes wrong
You see | What to do |
Where tracked says "No facility carries this KPI's tags" | Add the tag to a facility, as in Step 2. |
A KPI has no KPI tags | It can be reported at any facility that has no KPI tags mapped. Tag it to limit where it is tracked. |
A facility tracks KPIs it should not | Remove the KPI tag from that facility's KPIs tracked here. |
Checklist
☐ KPI tag on the KPI
☐ Same tag on each facility that reports it
☐ Where tracked lists the right facilities
Still stuck? Chat with us using the chat icon in Noa. Tell us which Onboarding tab you were on.




